posted by
bugshaw at 11:17pm on 03/09/2007
Lots done. Shed cleared, Bob the Builder (Robert the Handyman) fixed doors and put a lock on the dining room. Dining room is scarily full of stuff already, packed away. The loft boards are great - I keep passing boxes to Simon, he stuffs them up in the loft. It consumes everything we throw at it. And it's not a large loft. Video cassettes are in plastic crates - they'll go live in the shed (too dangerously flammable to leave in the house, apparently!). 7 bags of rubbish in the bin, 4 bags of non-rubbish to the charity shop.
Need to fix gutter, sort out contract, chase gas certificate. Pack, pack, pack, fall over. Repeat.
Need to fix gutter, sort out contract, chase gas certificate. Pack, pack, pack, fall over. Repeat.